| Availability: | |
|---|---|
| Quantity: | |
The LEOMON FKH-45II/TGW is an industrial-grade high-temperature steam heat pump engineered for medium-scale process heating requiring stable 150°C steam output of 80kg/h. With a heating capacity of 45kW and power consumption of 28kW, this model achieves significant energy savings compared to electric or fuel-fired boilers. It features a rugged build (2100×780×2000 mm, 580 kg), low noise (≤72 dB), and reliable operation in ambient temperatures down to 15°C. The DN32 steam outlet and DN20 water inlet ensure easy integration into existing steam distribution systems. Ideal for continuous production lines where temperature and pressure consistency is critical.

1. Excellent Steam Stability
Advanced PID control and high-precision sensors maintain steam temperature at 150°C ±2°C, even with fluctuating water inlet or ambient conditions. This stability improves product quality in processes like drying, curing, and sterilization.
2. High Efficiency Reduces Operating Costs
With a rated heating consumption of 28kW to deliver 45kW of heat, the unit provides 60% energy savings vs. electric resistance heating. Over an 8,000-hour annual operation, savings can exceed 100,000 kWh of electricity, drastically lowering your steam generation cost.
3. Durable Construction for Harsh Environments
The unit uses anti-corrosion coating and a robust steel frame. IPX4 water resistance allows outdoor installation. The industrial-grade compressor and fan motor are designed for continuous duty, offering a design life of over 10 years.
4. Smart Control & Remote Monitoring
The built-in PLC controller supports automatic start/stop, fault diagnosis, and alarm outputs. Optional 4G/Wi-Fi module enables remote monitoring of steam temperature, pressure, and energy consumption via smartphone or PC.
| Model | FKH-45II/TGW |
| Generate steam quantity | 80kg |
| Power Specifications | 380V 3N~50Hz |
| A1 heating capacity (20 ℃) | 45KW |
| A1 Heating consumption power | 28KW |
| Maximum operating current | 70A |
| Noise | ≤72dB(A) |
| Unit size (length x width x height mm) | 2100×780×2000 |
| Steam connection size | DN32 |
| Size of water replenishment connection pipe | DN20 |
| Unit weight (kg) | 580 |
| Compressor | Xecom |
| Refrigerants | Low stage: R515B High stage: R1233zd |
Medium-Scale Food Processing Plants
Perfect for continuous steaming of meat, seafood, or vegetables. The 80kg/h steam output maintains 150°C with high stability (±2°C), essential for product quality and food safety.
Textile Dyeing & Setting
Provides consistent process steam for fabric dyeing, drying, and heat-setting machines. The unit’s stable output reduces color variation and improves production efficiency.
Chemical Reaction Kettles
Suitable for indirect heating of jacketed reactors where 150°C steam is required. The 45kW heating capacity supports batch operations of 500–1000 liters.
Installation typically takes 2–3 days by a qualified technician. The unit requires a 380V 3-phase supply (70A max current), soft water feed line (DN20), and steam outlet (DN32). We recommend installing a water softener upstream to prevent scaling. Daily maintenance involves checking the water level and blowdown once per shift. Every 1–2 months, clean the water strainer and inspect the steam trap. An annual professional service includes compressor oil check, coil cleaning, and electrical torque verification. With proper care, the unit runs trouble-free for over 10 years.
Q1: Does this unit require water treatment?
A: Yes, we strongly recommend softened or demineralized water to prevent scale buildup in the steam generator. Scale reduces heat transfer efficiency and may cause overheating.
Q2: Can it produce superheated steam?
A: No, the unit outputs saturated steam at 150°C. If superheated steam is needed, an additional superheater can be added downstream.
Q3: What is the required electrical supply?
A:380V 3N~50Hz, with a maximum operating current of 70A. A dedicated circuit breaker and appropriate cable size are required.
Q4: How often should maintenance be performed?
A: Basic inspection every 3 months (filters, electrical, refrigerant levels). Annual professional maintenance is recommended, including cleaning of the evaporator and checking the compressor oil.